Installation supervision services for ballast water management systems

Regarding the provision of ballast water management systems, An Tin Hai Phong is always proud to be a leading enterprise with many years of experience in the field of construction and installation of ballast water management systems for ships – from repaired ships requiring new installation, to newly built ships.

Depending on the needs of each customer and the actual situation of the project, we will advise and provide the most suitable installation supervision services to customers. Steps to carry out our installation supervision work will include:

  • Conduct project implementation meetings with ship owners and construction parties.
  • Check and determine the main equipment installation location and equipment base location with the construction team. Confirm the locations that will be modified to install the BWMS of equipment and pipes, confirm the way to bring the equipment into the machine room, confirm the service works to bring the equipment into the installation location.
  • Supervising putting equipment in place for installation, transferring pipe details, equipment spools that have been machined spool on the workshop to the ship.
  • Supervise the installation of the equipment base into position, and install the main equipment into position.
  • Supervise the assembly of the system’s main ballast pipes and accompanying valves.
  • Supervise the repair of the ship’s old pipes and connections to the system and associated valves.
  • Supervise the processing and assembly of sediment discharge pipes, fresh water pipes, and compressed air pipes.
  • Supervising the complete installation of sensors and indicators (IT1, IT2, YV, TT, PT1, PT2, PT3, PT4, …).
  • Supervising the delivery of electrical cables serving the connection of the system on board and conducting punching through walls, welding cable trays to pull wires.
  • Supervise the pulling of electrical wires to equipment connection locations and make connections to electrical cabinets.
  • Supervising the connection of equipment area, signal connection of ship’s bypass valves to the general control system and belting of electrical cables, pouring sealant of through-wall troughs, finishing, adding shelves, … • Check system installation and check system electrical connection.

With the goal of bringing the best experience to customers when using An Tin Hai Phong‘s services, we always try and constantly improve, not only installation supervision services but also all other technical services we provide.